The Indiana Room serves as a repository for U.S. Environmental Protection Agency documents relating to the Polychlorinated Biphenyl (PCB) contamination and clean-up of several Monroe County sites. This massive collection is continually added to and indexed to aid in locating information. The documents below are those added in the past two years. To view these or the entire PCB collection please visit the Indiana Room during normal hours.
Date received, title, author, and date of document
2009 PCB Documents
December 2009 - Monthly Report (November 2009) for the Illinios Central Spring Treatment Plant, Bloomington, Indiana.(Paper). Prepared by Steven B. Wade, Primary Operator. December 2, 2009.
December 2009 - Monthly Report (October 2009) for the Illinios Central Spring Treatment Plant, Bloomington, Indiana.(Paper). Prepared by Steven B. Wade, Primary Operator. November 9, 2009.
December 2009 - Monthly Report (September 2009) for the Illinios Central Spring Treatment Plant, Bloomington, Indiana.(Paper). Prepared by Steven B. Wade, Primary Operator. October 8, 2009.
December 2009 - Monthly Report (August 2009) for the Illinios Central Spring Treatment Plant, Bloomington, Indiana.(Paper). Prepared by Steven B. Wade, Primary Operator. September 14, 2009.
December 2009 - Monthly Report (July 2009) for the Illinios Central Spring Treatment Plant, Bloomington, Indiana.(Paper). Prepared by Steven B. Wade, Primary Operator. August 12, 2009.
Sept 21, 2009 - Removal Oversight Summary for August 31 through September 4, 2009 (Week 7) ABB Plant Site. Bloomington, Indiana.(Paper). Prepared by Jeffer J. Lifka, Project Manager. September 11, 2009. NOTE: The ABB Plant Site was formally the Westinghouse Electric capacitor facility.
Sept 21, 2009 - Removal Oversight Summary for August 24 through 28, 2009 (Week 6) ABB Plant Site. Bloomington, Indiana.(Paper). Prepared by Jeffer J. Lifka, Project Manager. September 4, 2009. NOTE: The ABB Plant Site was formally the Westinghouse Electric capacitor facility.
Sept 21, 2009 - Removal Oversight Summary for August 17 through 21, 2009 (Week 5) ABB Plant Site. Bloomington, Indiana.(Paper). Prepared by Jeffer J. Lifka, Project Manager. August 28, 2009. NOTE: The ABB Plant Site was formally the Westinghouse Electric capacitor facility.
Sept 21, 2009 - Removal Oversight Summary for August 10 through 14, 2009 (Week 4) ABB Plant Site. Bloomington, Indiana.(Paper). Prepared by Jeffer J. Lifka, Project Manager. August 21, 2009. NOTE: The ABB Plant Site was formally the Westinghouse Electric capacitor facility.
Sept 21, 2009 - Removal Oversight Summary for August 3 through 7 , 2009 (Week 3) ABB Plant Site. Bloomington, Indiana.(Paper). Prepared by Jeffer J. Lifka, Project Manager. August 14, 2009. NOTE: The ABB Plant Site was formally the Westinghouse Electric capacitor facility.
Sept 21, 2009 - Removal Oversight Summary for July 27 through 31, 2009 (Week 2) ABB Plant Site. Bloomington, Indiana.(Paper). Prepared by Jeffer J. Lifka, Project Manager. August 7, 2009. NOTE: The ABB Plant Site was formally the Westinghouse Electric capacitor facility.
Sept 21, 2009 - Removal Oversight Summary for July 20 through 24, 2009 (Week 1) ABB Plant Site. Bloomington, Indiana.(Paper). Prepared by Jeffer J. Lifka, Project Manager. July 30, 2009. NOTE: The ABB Plant Site was formally the Westinghouse Electric capacitor facility.
July 31, 2009 - Monthly Report (June 2009) for the Illinios Central Spring Treatment Plant, Bloomington, Indiana.(Paper). Prepared by Steven B. Wade, Primary Operator. July 9, 2009.
July 31, 2009 - Monthly Report (May 2009) for the Illinios Central Spring Treatment Plant, Bloomington, Indiana.(Paper). Prepared by Steven B. Wade, Primary Operator. June 19, 2009.
July 31, 2009 - Monthly Report (April 2009) for the Illinios Central Spring Treatment Plant, Bloomington, Indiana.(Paper). Prepared by Steven B. Wade, Primary Operator. May 15, 2009.
July 7 , 2009 - Final Soil and Concrete Sampling Investigation Report for the Cleanup at the ABB Plant Site, 300 North Curry Pike, Bloomington, IN. (CD). Sent by Thomas Alcamo, Chemical Engineer. July 1, 2009.
June 16 , 2009 - Work Plan for Soil Remediation and Removal of the Concrete Slab Floor, Former Westinghouse Electric / ABB Plant Site, Bloomington, Indiana.(Paper and CD). Prepared by PSARA Technologies, Inc. June 2009. Vol. 1 and Vol. 2 (Appendices).
May 1, 2009 - Monthly Report (March 2009) for the Illinios Central Spring Treatment Plant, Bloomington, Indiana.(Paper). Prepared by Steven B. Wade, Primary Operator. April 9, 2009.
May 1, 2009 - Monthly Report (February 2009) for the Illinios Central Spring Treatment Plant, Bloomington, Indiana.(Paper). Prepared by Steven B. Wade, Primary Operator. March 12, 2009.
May 1, 2009 - Monthly Report (January 2009) for the Illinios Central Spring Treatment Plant, Bloomington, Indiana.(Paper). Prepared by Steven B. Wade, Primary Operator. February 9, 2009.
April 2, 2009 - Sampling Results regarding the cleanup of the ABB Plant Site, formerly the Westinghouse Electric capacitor facility. (Paper and CD). Prepared by Thomas Alcamo, Chemical Engineer, US EPA Region 5, Chicago, IL. March 16, 2009.
2008 PCB Documents
February 6, 2009- Monthly Report (December 2008) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on January 14, 2009.
February 6, 2009- Monthly Report (November 2008) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on December 4, 2008.
February 6, 2009- Monthly Report (October 2008) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on November 23, 2008.
October 19, 2008- Monthly Report (September 2008) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on October 12, 2008.
September 19, 2008- Monthly Report (February 2008) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on September 4, 2008.
September 19, 2008- Monthly Report (February 2008) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on August 2, 2008.
August 11, 2008- Monthly Report (June 2008) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on July 25, 2008.
July 5, 2008- Monthly Report (May 2008) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on June 27, 2008.
May 2008- Monthly Report (April 2008) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on May 15, 2008.
May 2008- Monthly Report (March 2008) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary OOperator. Report preared for the Indiana Department of Environmental Management on April 21, 2008.
April 18, 2008- Monthly Report (February 2008) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator for Indiana Department of Environmental Management on March 24, 2008.
Mar 5, 2008- Monthly Report (March 2008) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on February 18, 2008.
2007 PCB Documents
May 5, 2008- Administrative Records for Neal's Landfill Site Update #4 (Paper index and CD). Prepared by US EPA. (September 28, 2007).
February 15, 2008 - Draft PCB Case In the US District Court for the Southern Disctrict of Indiana Indianapolis Division. USA. et al,. Plaintiffs, V. CBS CORPORATION, f/k/a/ VIACOM INC., f/k/a WESTINGHOUSE ELECTRIC CORPORATION, et al., Defendant. THE CITY OF BLOOMINGTON, INDIANA, et al., Plaintiffs, V. CBS CORPORATION, f/k/a, VIACOM INC., f/k/a CBS Corporation, f/k/a WESTINGHOUTE ELECTRIC CORPORATION, et. al., Defendant. Cause No. 1:81 -cv-0448-RLY-KPF Paper edition.
March 30, 2008- Monthly Report (February 2007) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on March 19, 2007.
March 30, 2008- Monthly Report (March 2007) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on April 20, 2007.
March 30, 2008- Monthly Report (April 2007) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on May 25, 2007.
March 30, 2008- Monthly Report (May 2007) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on June 26, 2007.
March 30, 2008- Monthly Report (June 2007) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on June 20, 2007.
March 30, 2008- Monthly Report (July 2007) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator for Indiana Department of Environmental Management on August 21, 2007.
March 30, 2008- Monthly Report (August 2007) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on September 24, 2007.
March 30, 2008- Monthly Report (September 2007) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on October 3, 2007.
March 30, 2008- Monthly Report (October 2007) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on November 7, 2007.
May 5, 2008- Monthly Report (November 2007) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on December 21, 2007.
March 30, 2008- Monthly Report (December 2007) for the Operation of the Illinois Central Spring Treatment Plant (ICSTP).(Paper). Prepared by Steven B. Wade, Primary Operator. Report preared for the Indiana Department of Environmental Management on January 17, 2008.
October 11, 2007- Administrative Records for Neal's Landfill Site Update #4 (Paper index and CD). Prepared by US EPA. (September 28, 2007).
September 25, 2007- Permit Renewal for the Dillman Road WWTP . Prepared by The Indiana Department of Environmental Management. (September 2007)
July 13, 2007- Proposed Plan for the Records of Secision Amendment Operable Units 2 and 3. Neal's Landfill Superfund Site . Prepared by US EPA. (July 2007).
July 13, 2007- Administrative Records for Neal's Landfill Site (Paper index and CD). Prepared by US EPA. (July 5, 2007).
April 30, 2007- Illinois Central Spring Treatment Facility - January 2007 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (February 20, 2007).
April 30, 2007- Illinois Central Spring Treatment Facility - December 2006 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (January 18, 2007).
April 30, 2007- Illinois Central Spring Treatment Facility - November 2006 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (December 15, 2006)
April 30, 2007- Illinois Central Spring Treatment Facility - October 2006 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (November 17, 2006).
April 30, 2007- Illinois Central Spring Treatment Facility - September 2006 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (October 25, 2006).
2006 PCB Documents
Date received, title, author, and date of document
October 28, 2006- Illinois Central Spring Treatment Facility - July 2006 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (August 16, 2006).
October 28, 2006- Illinois Central Spring Treatment Facility - August 2006 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (September 15, 2006).
August 2, 2006- Illinois Central Spring Treatment Facility - June 2006 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (July 17, 2006).
August 2, 2006- Illinois Central Spring Treatment Facility - May 2006 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (June 22, 2006).
July 11, 2006- Illinois Central Spring Treatment Facility - November 2005 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (December 15, 2005).
June 20, 2006- Illinois Central Spring Treatment Facility - March 2006 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (April 15, 2006).
June 20, 2006- Illinois Central Spring Treatment Facility - April 2006 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated May 16, 2006).
June 20, 2006- Sludge Sampling Results Illinois Central Spring Treatment Facility - Lemon Lane Superfund Site. Prepared by IDEM. (March 8, 2006).
June 20, 2006- Field Sampling Plan SRS Tanks Illinois Central Spring Treatment Plant. Prepared by Environmental Field Services, Inc. (Dated December 2005).
May 2, 2006- Illinois Central Spring Treatment Facility - December 2005 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (December 19, 2005).
May 2, 2006- Illinois Central Spring Treatment Facility - January 2006 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated February 15, 2006).
May 2, 2006- Illinois Central Spring Treatment Facility - February 2006 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated March 15, 2006).
February 6, 2006- Bennett's Dump Site Update #3 (1 paper document and 2 CDs.) US EPA. (Dated February 2, 2006).
January 12, 2006- Illinois Central Spring Treatment Facility - October 2005 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated November 14, 2005).
January 12, 2006- Illinois Central Spring Treatment Facility - August 2005 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated September 15, 2005).
January 12, 2006- Illinois Central Spring Treatment Facility - June 2005 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated July 15, 2005).
2005 PCB Documents
Date received, title, author, and date of document
November 17, 2005- Illinois Central Spring Treatment Facility - September 2005 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated November 15, 2005).
September 3, 2005- Illinois Central Spring Treatment Facility - July 2005 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated August 15, 2005).
July 16, 2005- Quarterly Inspection and Maintenance Report: First Quarter 2005, Lemon Lane Landfill. Prepared by Viacom (Dated March 24, 2005).
July 16, 2005- Quarterly Inspection and Maintenance Report: First Quarter 2005, Neal's Landfill. Prepared by Viacom (Dated March 24, 2005).
July 16, 2005- Final Technical Memorandum Regarding Stream Conditions and Fish Sampling Activities in Stout's Creek, Bennett's Dump Site. Prepared by Tetra Tech (Dated April 13, 2005).
July 16, 2005- Surface Water, Flow and Water Level Monitoring Second Quarter 2004, Lemon Lane Landfill. Prepared by Viacom (Dated April 22, 2005).
July 16, 2005- Surface Water, Flow and Water Level Monitoring, Third Quarter, 2004, Neal's Landfill. Prepared by Viacom (Dated May 4, 2005).
July 16, 2005- Clear Creek November 2004 Fish Sample Aroclor PCB Validation. Prepared by Viacom (Dated May 26, 2005).
July 16, 2005- Clear Creek November 2004 Sediment Sample PCB Validation. Prepared by Viacom (Dated May 26, 2005).
July 16, 2005- Clear Creek November 2004 Fish Sample - Congener PCB Validation. Prepared by Viacom (Dated May 26, 2005).
July 16, 2005- Data Validation Review of Clear Creek Fish and Sediment Samples, November 2004 Validation, Lemon Lane Landfill. Prepared by Tetra Tech EM, Inc.(Dated June 15, 2005).
July 16, 2005- Scope of Work for Installation of Recovery Piezometers in Buried Quarries at Bennett's Dump Site. (Dated June 15, 2004).
July 16, 2005- Field Oversight Summary for May 17 through 25, 2005, Clear Creek Sediment Investigation, Lemon Lane Landfill. Prepared by Tetra Tech EM, Inc.(Dated June 20, 2005).
July 16, 2005- Quarterly Inspection and Maintenance Report: Second Quarter 2005, Neal's Landfill. Prepared by Viacom (Dated June 23, 2005).
July 16, 2005- Quarterly Inspection and Maintenance Report: Second Quarter 2005, Lemon Lane Landfill. Prepared by Viacom (Dated June 23, 2005).
July 16, 2005- First Five-Year Review Report for the Lemon Lane Landfill. Prepared by US EPA (Dated June 23, 2005).
July 13, 2005- Illinois Central Spring Treatment Facility - May 2005 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated June 13, 2005).
June 01, 2005- Illinois Central Spring Treatment Facility - April 2005 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated May 13, 2005).
June 01, 2005- Illinois Central Spring Treatment Facility - March 2005 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated April 12, 2005).
June 01, 2005- Illinois Central Spring Treatment Facility - February 2005 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated March 14, 2005).
March 24, 2005- Groundwater and Surface Water Monitoring Results Third and Fourth Quarters, 2004, Winston Thomas. Prepared by Viacom, Inc. (Dated March 8, 2005).
March 24, 2005- Groundwater and Surface Water Monitoring Results First and Second Quarters, 2004, Winston Thomas. Prepared by Viacom, Inc. (Dated January 7, 2005).
March 24, 2005- Clear Creek Fish Sampling Data of November 2004 . Prepared by Viacom, Inc. (Dated March 3, 2005).
March 24, 2005- Meeting Handouts. Illinois Central Spring PCB Dishcarge/Capture Analysis. (Dated February 24, 2005).
March 24, 2005- Meeting Handouts. Lemon Land Conduit Investigation. (Dated February 24, 2005).
March 24, 2005- Conard's Branch and Richland Creek Sediment Sampling and Analysis Report. Prepared by Viacom, Inc. (Dated January 2005).
March 24, 2005- Quarterly Inspection and Maintenance Report for the Fourth Quarter 2004, Lemon Land Landfill. Prepared by Viacom, Inc. (Dated January 7, 2005).
March 24, 2005- Field Oversight Summary for November 1 through 6, 2004 Clear Creek Investigation, Lemon Lane Landfill Site. Prepared by Tetra Tech EM, Inc. (Dated December 30, 2004).
March 24, 2005- Fish Tissue Sample Analytical Results, Lemon Lane Landfill Site. Prepared by Tetra Tech EM, Inc. (Dated December 21, 2004).
March 24, 2005- FIELDS Group Sediment Estimates for Clear Creek. Prepared by FIELDS Group. (Dated December 13, 2004).
March 24, 2005- Surface Water, Flow and Water Level Monitoring First Quarter 2004. Prepared by Viacom, Inc. (Dated November 4, 2004).
March 24, 2005- Report of Sediment and Soil Sampling Analysis on Clear Creek. Prepared by Viacom, Inc. (Dated November 2004).
March 24, 2005- Field Sampling Plan, Lemon Lane Landfill. Prepared by Tetra Tech, Inc. (Dated October 28, 2004).
March 24, 2005- Final Clear Creek Fish, Water and Sediment Sampling and Analysis Plan. Prepared by Viacom, Inc. (Dated October 26, 2004).
March 24, 2005- Quarterly Inspection and Maintenance Report, Third Quarter 2004, Neal's Landfill. Prepared by Viacom, Inc. (Dated October 13, 2004).
March 24, 2005- Conard's Branch and Richland Creek Final Sediment Sampling and Analysis Plan. Prepared by Viacom, Inc. (Dated October 13, 2004).
March 24, 2005- Quarterly Inspection and Maintenance Report, Third Quarter 2004, Lemon Lane Landfill. Prepared by Viacom, Inc. (Dated October 13, 2004).
March 24, 2005- Peak Flow Estimates for Neal's Landfill Northwest Spring System. unknown. (Dated October 6, 2004).
March 24, 2005- Neal's Landfill Northwest Spring System's Upper Sub-Basins Storm Reconnaissance, Flow Measurement and Dye Tracing. Prepared by Viacom, Inc. (Dated February 17, 2005).
March 24, 2005- Surface Water, Flow and Water Level Monitoring, Second Quarter 2004, Neal's Landfill. Prepared by Viacom, Inc. (Dated November 18, 2004).
March 24, 2005- Conard's Branch and Richland Creek Sediment Split Sample Analytical Results Neal's Landfill. Prepared by Tetra Tech EM, Inc. (Dated December 10, 2004).
March 24, 2005- Quarterly Inspection and Maintenance Report, Fourth Quarter 2004, Neal's Landfill. Prepared by Viacom, Inc. (Dated January 7, 2007).
March 24, 2005- Field Oversight Summary for November 4, 2004 Conard's Branch Investigation Neal's Landfill. Prepared by Tetra Tech, Inc. (Dated December 30, 2004).
March 24, 2005- Field Oversight Summary for October 5 through 15, 2004 Conard's Branch and Richland Creek. Prepared by Tetra Tech, Inc. (Dated December 3, 2004).
March 24, 2005- Spring Receiving Sump Overflow Pilot Test Sample Analytical Results Lemon Lane Landfill. Prepared by Tetra Tech, Inc. (Dated February 22, 2005).
March 24, 2005- Tetra Tech EM Inc, August 17, 2004 letter. Prepared by Viacom, Inc. (Dated September 22, 2004).
March 3, 2005- Illinois Central Spring Treatment Facility - January 2005 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated Feb. 14, 2005).
January 26, 2005- Illinois Central Spring Treatment Facility - November 2004 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated Dec. 15, 2004).
January 26, 2005- Illinois Central Spring Treatment Facility - December 2004 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated January 14, 2005).
2004 PCB Documents
Date received, title, author, and date of document
December 30, 2004- Surface Water, Flow and Water Level Monitoring Fourth Quarter 2003, Lemon Lane Landfill. Prepared by Viacom, Inc. (Dated September 9, 2004).
December 30, 2004- Surface Water, Flow and Water Level Monitoring First Quarter 2004, Lemon Lane Landfill. Prepared by Viacom, Inc. (Dated November 4, 2004).
December 30, 2004- Surface Water, Flow and Water Level Monitoring Second Quarter 2004, Neal's Landfill. Prepared by Viacom, Inc. (Dated November 18, 2004).
December 30, 2004- Scope of Work For Cave Sink Dye Trace [Neal's Landfill]. Prepared by Viacom, Inc. (Dated November 1, 2004).
December 30, 2004- Site-Specific Health and Safety Plan. Neal's Landfill Sinkhole/Cave Entry. Prepared by Viacom, Inc. (Dated November 5, 2004).
December 30, 2004- Report of Sediment and Soil Sampling and Analysis on Clear Creek. Prepared by Viacom, Inc. (Dated November 2004).
December 30, 2004- Field Oversight Summary for October 5 through 15, 2004 Conard's Branch and Richland Creek. Prepared by Tetra Tech EM, Inc. (Dated December 3, 2004).
December 30, 2004- Conard's Branch and Richland Creek Sediment Split Sample Analytical Results Neal's Landfill. Prepared by Tetra Tech EM, Inc. (Dated December 10, 2004).
December 30, 2004- FIELDS Group Sediment Thickness Estimates for Clear Creek. Prepared by US EPA. (Dated December 13, 2004).
December 30, 2004- Fish Tissue Sample Analytical Results for Lemon Lane Landfill. Prepared by Tetra Tech EM, Inc. (Dated December 21, 2004).
December 21, 2004- Illinois Central Spring Treatment Facility - October 2004 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated November 1, 2004).
November 02, 2004- Responses to Viacom's comments on Data Validation Review of Neal's Landfill Fish Samples May 2003. Prepared by Tetra Tech. (Dated October 5, 2004).
November 02, 2004- Quarterly Inspection and Maintenance Report, 3rd Quarter 2004, Lemon Lane Landfill. Prepared by Viacom. (Dated October 13, 2004).
November 02, 2004- Quarterly Inspection and Maintenance Report, 3rd Quarter, 2004, Neal's Landfill. Prepared by Viacom. (Dated October 13, 2004).
November 02, 2004- Final Sediment Sampling and Analysis Plan for Conard's Branch and Richland Creek. Prepared by Viacom. (Dated October 13, 2004).
November 02, 2004- Field Sampling Plan for Fish Tissue Sampling in Clear Creek. Prepared by Tetra Tech. (Dated October 28, 2004).
November 02, 2004- Fish, Water and Sediment Sampling and Analysis for Clear Creek. Prepared by Viacom. (Dated October28, 2004).
October 18, 2004- Illinois Central Spring Treatment Facility - September 2004 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated October 12, 2004).
October 11, 2004- Neal's Landfill Fish Samples May 2003 Validation. Prepared by Viacom. (Dated August 6, 2004).
October 11, 2004- Revised Fish Tissue Dample Analytical Results, Neal's Landfill. Prepared by Tetra Tech. (Dated September 21, 2004).
October 11, 2004- Scope of Work for Continued Investigation of the Shallow Groundwater Source of Middle Spring at Bennett's Dump. Prepared by Viacom. (Dated September 2004).
October 11, 2004- Fish and Crayfish Tissue Sampling for Aroclor and Lipid Analysis at Stout's Creek near Bennett's Dump. Prepared by Normandeau Associates, Inc. (Dated September 2, 2004).
October 11, 2004- Surface Water, Flow and Water Level Monitoring Fourth Quarter 2003, Lemon Lane Landfill. Prepared by Viacom. (Dated September 9, 2004).
October 11, 2004- Groundwater, Surface Water, Flow and Water Level Monitoring First Quarter 2004, Bennett's Dump. Prepared by Viacom. (Dated September 14, 2004).
October 11, 2004- Summary of Field Activities on June 18, 2004 Neal's Landfill. Prepared by Tetra Tech EM, Inc. (Dated September 20, 2004).
October 11, 2004- Neal's Landfill Fish Sample November 2003 Validation. Prepared by Viacom, Inc. (Dated August 11, 2004).
October 11, 2004- Comparison of Fish Tissue Split Sample Analytical Data, Bennett's Dump Site. Prepared by Tetra Tech EM, Inc. (Dated August 13, 2004).
October 11, 2004- Data Validation Review of "Neal's Landfill Fish Sample May 2003 Validation". Prepared by Tetra Tech EM, Inc. (Dated August 17, 2004).
October 11, 2004- Report of Sediment and Soil Sampling and Analysis Illinois Central and Quarry Springs. Prepared by Viacom. (Dated September 2004).
October 11, 2004- Final Report for the Groundwater Investigation at Neal's Landfill. Prepared by Viacom. (Dated July 2004).
October 11, 2004- Fish Tissue Sample Analytical Results, Neal's Landfill. Prepared by Tetra Tech EM, Inc. (Dated September 7, 2004).
October 11, 2004- Data Validation Review of "Neal's Landfill Fish Samples November 2003 Validation". Prepared by Tetra Tech EM, Inc. (Dated September 1, 2004).
October 11, 2004- Illinois Central Spring Treatment Facility - August 2004 Monthly Operation Report. Prepared by Environmental Field Services, Inc. (Dated Sept. 1, 2004).
September 2, 2004- Illinois Central Spring Treatment Facility - May 2004 Monthly Operation Report. Prepared by Earth Tech. (Dated June 16, 2004).
September 2, 2004- Illinois Central Spring Treatment Facility - June 2004 Monthly Operation Report. Prepared by Earth Tech. (Dated July 26, 2004).
September 2, 2004 - Illinois Central Spring Treatment Facility - July 2004 Monthly Operation Report. Prepared by Earth Tech. (Dated August 11, 2004).
August 2, 2004- Sarber Sinkhole Investigation Summary, Neal's Landfill. Prepared by Viacom. (April 28, 2004).
August 2, 2004 - Field Sampling Plan for Fish Tissue Analysis for Richland Creek, Neal's Landfill. Prepared by Tetra Tech. (Dated June 17, 2004).
August 2, 2004- Fish Tissue Split Sample Analytical Results for Bennett's Dump Site. Prepared by Tetra Tech. (July 20, 2004).
August 2, 2004 - Quarterly Inspection and Maintenance Reports; Second Quarter 2004 Neal's Landfill. Prepared by Viacom. (Dated June 22, 2004).
August 2, 2004 - Quarterly Inspection and Maintenance Reports; Second Quarter 2004 Lemon Lane Landfill. Prepared by Viacom. (Dated June 22, 2004).
August 2, 2004- Field Oversight Summary for May 25 through 28, 2004, Stout's Creek Investigation. Prepared by Tetra Tech. (June 28, 2004).
August 2, 2004 - Scope of Work for Investigation Relating to the Design to the North Spring Area Total Collection System. Prepared by Viacom. (Dated July 1, 2004).
August 2, 2004- Field Oversight Summary for June 2 through 25, 2004, Clear Creek Sediment Investigation. Prepared by Tetra Tech. (July 6, 2004).
August 2, 2004 - Surface Water, Flow and Water Level Monitoring First Quarter 2004, Neal's Landfill. Prepared by Viacom. (Dated July 13, 2004).
August 2, 2004 - Groundwater, Surface Water, Flow and Water Level Monitoring Fourth Quarter 2003, Bennett's Dump. Prepared by Viacom. (Dated July 20, 2004).
August 2, 2004- Clear Creek Sediment Split Sample Analytical Results, Lemon Land Landfill. Prepared by Tetra Tech. (July 26, 2004).
August 2, 2004- Scope of Work for Continued Investigation of the Shallow Groundwater Source of Middle Spring at Bennett's Dump. (July 27, 2004).
July 6, 2004- Illinois Central Spring Treatment Facility - January 2004 Monthly Operation Report. Prepared by Earth Tech. (Dated February 17, 2004).
July 6, 2004- Illinois Central Spring Treatment Facility - February 2004 Monthly Operation Report. Prepared by Earth Tech. (Dated May 6, 2004).
July 6, 2004 - Illinois Central Spring Treatment Facility - March 2004 Monthly Operation Report. Prepared by Earth Tech. (Dated May 11, 2004).
July 6, 2004- Illinois Central Spring Treatment Facility - April 2004 Monthly Operation Report. Prepared by Earth Tech. (Dated May 12, 2004).
July 6, 2004- Fish, Water and Sediment Sampling and Analysis for Stout's Creek. Prepared by Viacom. (Dated May 10, 2004).
July 6, 2004 - Final Report for the Groundwater Investigation at Bennett's Dump. Prepared by Viacom. (Dated February2004).
July 6, 2004- Clear Creek Sediment Sampling and Analysis Plan. Prepared by Viacom. (Dated June 1, 2004).
April 8, 2004- Illinois Central Spring Treatment Facility - August 2003 Monthly Operation Report. Prepared by Earth Tech. (Dated March 26, 2004).
April 8, 2004- Illinois Central Spring Treatment Facility - September 2003 Monthly Operation Report. Prepared by Earth Tech. (Dated April 1, 2004).
April 8, 2004 - Illinois Central Spring Treatment Facility - October 2003 Monthly Operation Report. Prepared by Earth Tech. (Dated April 2, 2004).
April 8, 2004- Illinois Central Spring Treatment Facility - November 2003 Monthly Operation Report. Prepared by Earth Tech. (Dated April 2, 2004).
April 8, 2004 - Illinois Central Spring Treatment Facility - December 2003 Monthly Operation Report. Prepared by Earth Tech. (Dated April 5, 2004).
2003 PCB Documents
Date received, title, author, and date of document
November 22, 2003 - 2002 Fish Data Validation Report. Prepared by Viacom. (Dated October 2003).
November 22, 2003 - Quarterly Inspection and Maintenance Report for Third Quarter 2003. Lemon Lane Landfill. Prepared by Viacom. (Dated September 15, 2003).
November 22, 2003 - Groundwater Monitoring Results for 2nd Quarter 2003, Winston Thomas. Prepared by Viacom. (Dated October 27, 2003).
November 22, 2003 - Interim Test Report for Recent Karst Conduit Testing at Lemon Lane Landfill. Prepared by Viacom. (Dated August 27, 2003).
November 22, 2003 - Surface Water, Flow and Water Level Monitoring, Second Quarter 2003, Neal's Landfill. Prepared by Viacom. (Dated August 20, 2003).
November 22, 2003 - Final Technical Memorandum Regarding Stream Conditions and Fish Sampling Neal's Landfill. Prepared by Tetra Tech. (Dated October 29, 2003).
November 22, 2003 - Conard's Branch and Richland Creek Sampling Plan for Fall 2003. Prepared by Viacom. (Dated November, 2003).
November 22, 2003 - Scope of Work for Dye Tracing from PZ-H7 and MW-1 at the Bennet's Dump Site. (Dated September 15, 2003).
November 22, 2003 - Statistical Analysis of PCB Concentrations in Fish Samples Collected near the Neal's Landfill Site. Prepared by Tetra Tech. (Dated October 29, 2003).
November 22, 2003 - Statistical Analysis of PCB Concentrations in Fish Samples Collected near the Lemon Lane Landfill Site. Prepared by Tetra Tech. (Dated November 4, 2003).
November 22, 2003 - Surface Water, Flow and Level Monitoring First Quarter 2003, Neal's Landfill. Prepared by Viacom. (Dated July 15, 2003).
November 22, 2003 - Surface Water, Flow and Level Monitoring First Quarter 2003, Bennett's Dump. Prepared by Viacom. (Dated July 15, 2003).
November 22, 2003 - Surface Water, Flow and Level Monitoring Second Quarter 2003, Bennett's Dump. Prepared by Viacom. (Dated September 29, 2003).
November 22, 2003 - Investigation Work at Bennett's Dump. Prepared by Viacom. (Dated September 30, 2003).
November 22, 2003 - PCB Capture Computations for Neal's Landfill. Prepared by Earth Tech. (Dated June 25, 2003).
November 22, 2003 - Clear Creek Sediment Thickness Estimates. Prepared by EPA. (Dated August 27, 2003).
November 22, 2003 - First Five Year Review Report for Neal's Dump. Prepared by EPA. (Dated November 7, 2003).
October 10, 2003 - Neal's Dump Post-Remediation Groundwater Monitoring Plan QAPjP Volume XVIII. Prepared by CBS. (Dated January 19, 1999).
October 10, 2003 - Review of Neal's Dump Groundwater Monitoring Data. Prepared by US EPA. (Dated October 1, 2003).
October 10, 2003 - Groundwater and Residential Water Well Monitoring Second Semi-Annual, 2003, Neal's Dump, Owen County. Prepared by Viacom. (Dated September 18, 2003).
October 10, 2003 - Groundwater and Residential Water Well Monitoring First Semi-Annual, 2002, Neal's Dump, Owen County. Prepared by Viacom. (Dated December 17, 2002).
October 10, 2003 - Groundwater Monitoring Results for February/First Quarter 2002. Neal's Dump. Prepared by Viacom. (Dated June 5, 2002).
October 10, 2003 - 1) Post-Excavation Groundwater Monitoring Results for December 4, 2001, Neal's Dump and 2) Return to Semi-annual Sampling at Neal's Dump. Prepared by Viacom. (Dated March 27, 2003).
October 10, 2003 - Post-Excavation Groundwater Monitoring Results for August 8 & 9, 2001, Neal's Dump. Prepared by Viacom. (Dated October 18, 2001).
October 10, 2003 - Post-Excavation Groundwater Monitoring Results for February 2001, Neal's Dump. Prepared by Viacom. (Dated April 30, 2001).
October 10, 2003 - Post-Excavation Groundwater Monitoring Results for Neal's Dump, November 30, 1999. Prepared by CBS. (Dated February 17, 2000).
October 10, 2003 - Groundwater and Residential Water Well Monitoring First Semi-Annual, 2003, Neal's Dump, Owen County. Prepared by Viacom. (Dated August 27, 2003).
October 1, 2003 - Illinois Central Spring Treatment Facility - July 2003 Monthly Operation Report. Prepared by Earth Tech. (Dated September 9, 2003).
October 1, 2003 - Illinois Central Spring Treatment Facility - June 2003 Monthly Operation Report. Prepared by Earth Tech. (Dated August 6, 2003).
October 1, 2003 - Illinois Central Spring Treatment Facility - May 2003 Monthly Operation Report. Prepared by Earth Tech. (Dated July 10, 2003).
June 28, 2003 - Surface Water Sample Analytical Results Lemon Lane Landfill Site. Prepared by Tetra Tech. (dated June 12, 2003).
June 28, 2003 - Field Sampling and Oversight Activities Summary for Winston-Thomas Wastewater Treatment Plant. Prepared by Tetra Tech. (dated June 20, 2003).
June 28, 2003 - Field Oversight Summary for May 27 and 28, 2003 Conard's Branch and Richland Creek Investigation Neal's Landfill Site. Prepared by Tetra Tech. (Dated June 20, 2003)
June 9, 2003 - Illinois Central Spring Treatment Facilty - November 2002 Monthly Operation Report. Prepared by Earth Tech. (Dated December 18, 2002).
June 9, 2003 - Illinois Central Spring Treatment Facility - April 2003 Monthly Operation Report. Prepared by Earth Tech. (Dated May 19, 2003).
May 31, 2003 - Richland Creek Fish and Water Sampling and Analysis Plan - QAPjP Volume XXXV. Prepared by Viacom. (Dated May 2003).
May 31, 2003 - Draft notes from karst conduit summary meeting. Prepared by Viacom. (no date).
May 28, 2003 - Field Oversight Summary for April 22, 2003 for Neal's Landfill. Prepared by Tetra Tech. (Dated April 29, 2003).
May 28, 2003 - Field Oversight Summary for April 15, 2003 for Neal's Landfill. Prepared by Tetra Tech. (Dated 2003).
May 28, 2003 - Surface Water Flow and Water Level Monitring - Fourth Quarter 2003, for Bennett's Dump Site. (Dated April 7, 2003).
May 28, 2003 - Groundwater, Surface Water, Flow and Water Level Monitoring - Fourth Quarter 2002. (Dated May 1, 2003).
May 28, 2003 - Surface Water Sample Analytical Results - Low FLow Effluent for ICS Water Treatment Plant. Prepared by Tetra Tech. (Dated May 15, 2003).
May 28, 2003 - Long-Term Groundwater Monitoring Plan for the Lemon Lane Landfill. Prepared by VIacom. (Dated April 2003).
April 7, 2003 - Illinois Cental Spring Treatment Facility - Fenruary 2003 Operations Report. Prepared by Earth Tech. (Dated March 18, 2003.
February 28, 2003 - Illinois Central Spring Treatment Facility - January 2003 Operations Report. Prepared by Earth Tech. (Dated February 20, 2003.
February 28, 2003 - Illinois Central Spring Treatment Facility - December 2002 Monthly Operation Report. Prepared by Earth Tech. (Dated January 22, 2003)
February 8, 2003 - Field Oversight Summary for November 11 through 14, 2002 for Neal's Landfill. Prepared by Tetra Tech. (dated December 13, 2002)
February 8, 2003 - Field Oversight Summary for November 25 through December 19, 2002 for Neal's Landfill. Prepared by Tetra Tech. (dated January 6, 2003)
February 8, 2003 - Neal Landfill Field Reconnaissance. Prepared by Earth Tech. (dated January 9, 2003)
February 8, 2003 - Surface Water Sample Analytical Results at Neal's Landfill. Prepared by Tetra Tech. (dated January 16, 2003)
February 8, 2003 - Storm Event Surface Water Sample Analytical Results at Lemon Lane Landfill. Prepared by Tetra Tech. (dated January 17, 2003)
February 8, 2003 - Neal's Landfill Reconnaissance Report and Dye Testing Plan. Prepared by Viacom. (dated January 29, 2003)
February 8, 2003 - Summary Test Report for Lemon Lane Dye Testing - Summary July - November 2002. Prepared by Viacom. (dated January 29, 2003)
January 9, 2003 - Quarterly Inspection and Mainenance Report of the Fourth Quarter 2002 at the Lemon Lane Landfill. Prepared by Viacom. (dated December 12, 2002)
January 9, 2003 - Quarterly Inspection and Mainenance Report of the Fourth Quarter 2002 at Neal's Landfill. Prepared by Viacom. (dated December 12, 2002)
January 9, 2003 - Storm Discharge Analysis at Conard's Branch - Correction. Prepared by Viacom. (dated December 19, 2002)
2002 PCB Documents
Date received, title, author, and date of document
December 18, 2002 - Fish, Water and Sediment Sampling and Analysis Plan for Clear Creek and Richland Creek. Prepared by Viacom. (dated November 4, 2002)
December 18, 2002 - Correspondence Discussing New Spring Collection System at Conard's Branch. Prepared by Viacom. (dated November 13, 2002)
December 18, 2002 - Correspondence Discussing Viacom's Proposal for New SPring COllection System at Neal's Landfill. Prepared by US EPA. (dated November 25, 2002)
December 18, 2002 - Bennett's Dump Current Status Report. Prepared by Tetra Tech. (dated December 6, 2002)
December 18, 2002 - Field Oversight Summary for Lemon Lane Landfill for November 11 through 14, 2002. Prepared by Tetra Tech. (dated December 12, 2002)
December 14, 2002 - Illinois Central Spring Treatment Plant - October 2002 Monthly Operations Report. Prepared by Earth Tech. (dated December 4, 2002)
November 8, 2002 - Illinois Central Spring Treatment Plant - September 2002 Monthly Operations Report. Prepared by Earth Tech. (dated October 16, 2002)
November 6, 2002 - Resubmittal of the Long-Term Groundwater Monitoring Plan for Neal's Landfill (resumbittal due to pages missing). Prepared by Viacom. (dated April 2002)
November 6, 2002 - Revised Field Sampling Plan for Asea Brown Boveri (ABB) Facility and Bennett's Dump site. Prepared by Tetra Tech. (dated June 20, 2002)
November 6, 2002 - Data Evaluation of Nonsplit Sample Analytical Results for Stout's Creek Near ABB and Bennett's Dump Sites . Prepared by Tetra Tech. (dated July 16, 2002)
November 6, 2002 - Field Sampling Activites Summary for Stout's Creek Near the ABB and Bennett's Dump Sites. Prepared by Tetra Tech. (dated August 7, 2002)
November 6, 2002 - Five-Year Review for Bennett's Dump Site. U.S. EPA. (dated August 22, 2002)
November 6, 2002 - Summary Report for Limited Gas Vent PUF Sampling at Neal's Landfill. Prepared by Viacom. (dated August 22, 2002)
November 6, 2002 - Field Oversight Summary for July 31 through August 20, 2002 for Lemon Lane Landfill. Prepared by Tetra Tech. (dated September 6, 2002)
November 6, 2002 - Storm Event Surface Water Sample Analytical Results for ABB. Prepared by Tetra Tech. (dated September 6, 2002)
November 6, 2002 - Preliminary Storm Discharge Analysis at Conard's Branch. Prepared by Viacom. (dated September 11, 2002)
November 6, 2002 - Groundwater, Surface Water, Flow and Water Level Monitoring for Bennett's Dump - 2nd Quarter 2002. Prepared by Viacom. (dated September 24, 2002)
November 6, 2002 - Quarterly Inspection and Maintenacne Report for Neal's Landfill - 3rd Quarter 2002. Prepared by Viacom. (dated September 26, 2002)
November 6, 2002 - Quarterly Inspection and Maintenance Report for Lemon Lane Landfill - 3rd Quarter 2002. Prepared by Viacom. (dated September 26, 2002)
November 6, 2002 - Review of Analytical Results for Laboratory Performance Evaluation Samples. Prepared by Tetra Tech. (dated October 8, 2002)
November 6, 2002 - Groundwater, Surface Water, Flow and Water Level Monitoring for the Lemon Lane Landfill - 2nd Quarter 2002. Prepared by Viacom. (dated October 8, 2002)
November 6, 2002 - Preliminary Storm Discharge Analysis at Conard's Branch. Prepared by Viacom. (dated October 18, 2002)
October 3, 2002 - Illinois Central Spring Treatment Plant - August 2002 Monthly Operations Report. Prepared by Earth Tech. (dated September 18, 2002)
August 29, 2002 - Illinois Central Spring Treatment Plant - July 2002 Monthly Operations Report. Prepared by Earth Tech. (dated August 20, 2002)
August 22, 2002 - Illinois Central Spring Treatment Plant - June 2002 Monthly Operations Report. Prepared by Earth Tech. (dated July 21, 2002)
August 22 , 2002 - Illinois Central Spring Treatment Plant - May 2002 Monthly Operations Report. Prepared by Earth Tech. (dated July 8, 2002)
August 8, 2002 - Letter to Joe Hailer concerning Illinois Central Spring Water Treatment Facility. Written by Jessica Huxhold Fliss, Indiana Deparment of Environmental Management. (dated March 18, 2002)
August 8, 2002 - Letter to Joe Hailer concerning Illinois Central Spring Water Treatment Facility. Written by Jessica Huxhold Fliss, Indiana Deparment of Environmental Management. (dated March 27, 2002)
August 8, 2002 - Letter to Joe Hailer concerning Illinois Central Spring Water Treatment Facility. Written by Jessica Huxhold Fliss, Indiana Deparment of Environmental Management. (dated July 2, 2002)
August 5, 2002 - Lemon Lane Landfill Addendum to the Revised Current Status Report Dated May 2001. Prepared by Tetra Tech. (dated July 26, 2002) Housed in white 3-ring binder
August 1, 2002 - Field Oversight Summary for July 8 through 10, 2002 Lemon Lane Landfill. Prepared by Tetra Tech. (dated July 22, 2002)
August 1, 2002 - Storm Event Surface Water Sample Analytical Results Lemon Lane Landfill. Prepared by Tetra Tech. (dated July 15, 2002)
August 1, 2002 - Storm Event Surface Water Sample Analytical Results Lemon Lane Landfill. Prepared by Tetra Tech. (dated May 30, 2002)
August 1, 2002 - Storm Event Surface Water Sample Analytical Results Lemon Lane Landfill. Prepared by Tetra Tech. (dated May 15, 2002)
August 1, 2002 - Storm Event Surface Water Sample Analytical Results Lemon Lane Landfill. Prepared by Tetra Tech. (dated April 26, 2002)
August 1, 2002 - Storm Event Surface Water Sample Analytical Results Lemon Lane Landfill. Prepared by Tetra Tech. (dated April 9, 2002)
August 1, 2002 - Storm Event Surface Water Sample Analytical Results Lemon Lane Landfill. Prepared by Tetra Tech. (dated April 26, 2002)
August 1, 2002 - Lemon Lane Landfill Continuous Monitoring Data for First Quarter 2002. Prepared by Viacom. (dated July 2, 2002)
August 1, 2002 - Groundwater Monitoring Results for January-April 2002 Lemon Lane Landfill. Prepared by Viacom. (dated July 2, 2002)
August 1, 2002 - Test Report for MW-41 - June 4, 2002 Packer/Pump Test Lemon Lane Landfill. Prepared by Viacom. (dated June 27, 2002)
August 1, 2002 - Quarterly Inspection and Maintenance Report: Second Quarter 2002 Lemon Lane Landfill. Prepared by Viacom. (dated June 26, 2002)
August 1, 2002 - Revised Report of Lemon Lane Landfill Continuous Monitoring Data for 1st Quarter 2001. Prepared by Viacom. (dated April 25, 2002)
August 1, 2002 - Lemon Lane Landfill Continuous Monitoring Data for 2nd Quarter 2001. Prepared by Viacom. (dated April 25, 2002)
August 1, 2002 - Lemon Lane Landfill Continuous Monitoring Data for 3rd Quarter 2001. Prepared by Viacom. (dated April 25, 2002)
August 1, 2002 - Quarterly Inspection and Maintenance Report Second Quarter 2002 Lemon Lane Landfill. Prepared by Viacom. (dated June 26, 2002)
August 1, 2002 - Modification of Monitoring Well NN-300A, 00-587A, 00-125A and NN-12A Lemon Lane Conduit Study. Prepared by Viacom. (dated May 31, 2002)
August 1, 2002 - Quarterly Inspection and Maintenance Report Second Quarter 2002 Neal's Landfill. Prepared by Viacom. (dated June 26, 2002)
August 1, 2002 - Field Oversight Summary for June 5 and 6, 2002 Neal's Landfill. Prepared by Tetra Tech. (dated June 21, 2002)
August 1, 2002 - Neal's Landfill Continuous Monitoring Data for January and February 2002. Prepared by Viacom. (dated May 28, 2002)
August 1, 2002 - Groundwater Monitoring Results for January and February 2002 Neal's Landfill. Prepared by Viacom. (dated May 28, 2002)
August 1, 2002 - Gas Vent Sampling at Neal's Landfill. Prepared by Viacom. (dated May 21, 2002)
August 1, 2002 - Indiana Department of Environmental Management Fish Tissue Data Summary PCB results, August 2001 Conrad's Branch Richland Creek. Prepared by U.S. EPA. (dated June 25, 2002)
August 1, 2002 - Quality Assurance of Sediment Analysis Data. Acid Volatile Sulfide Simultaneously Extracted Metals. Prepared by IDEM . (dated June 2002)
August 1, 2002 - Revised Report of Neal's Landfill Continuous Monitoring Data for 1st Quarter 2001. Prepared by Viacom. (dated April 25, 2002)
August 1, 2002 - Revised Report of Neal's Landfill Continuous Monitoring Data for 2nd Quarter 2002. Prepared by Viacom. (dated April 25, 2002)
August 1, 2002 - Neal's Landfill Continuous Monitoring Data for 3rd Quarter 2001. Prepared by Viacom. (dated April 25, 2002)
August 1, 2002 - Long-term Groundwater Monitoring Plan for Neal's Landfill. QAPjP Volume XXXI. Prepared by Viacom. (dated April 2002)
August 1, 2002 - Final Groundwater Investigation Plan Neal's Landfill. QAPjP Volume XXX Prepared by Viacom. (dated April 2002)
August 1, 2002 - Quarterly Inspection and Maintenance Report First Quarter 2002 Neal's Landfill. Prepared by Viacom. (dated April 4, 2002)
August 1, 2002 - Post-Excavation Groundwater Monitoring Results for January 3, 2002 Neal's Landfill. Prepared by Viacom. (dated March 27, 2002)
June 21 , 2002 - Illinois Central Spring Treatment Plant - April 2002 Monthly Operations Report. Prepared by Earth Tech. (dated May 30, 2002)
June 21, 2002 - Illinois Central Spring Treatment Plant - March 2002 Monthly Operations Report. Prepared by Earth Tech. (dated April 23, 2002)
May 6, 2002 - Final Groundwater Investigation Plan Bennett's Dump. QAPjP - Volume XXVIII. Prepared by Viacom, Inc. (dated March 2002)
May 6, 2002 - Long-term Groundwater Monitoring Plan Bennett's Dump. QAPjP - Volume XXIX. Prepared by Viacom, Inc. (dated March 2002)
April 25, 2002 - Mini-Quality Assurance Project Plan for CBS Corporation. Multisite Sampling and Analysis Support: Neal's Landfill, Bennett's Dump, Winston-Thomas Wastewater Treatment Plant, and Lemon Lane Landfill. Prepared by Tetra Tech. (dated December 13, 1999)
April 25, 2002 - Field Sampling Plan for CBS Corporation. Multisite Sampling Analysis and Support: Neal's Landfill, Bennett's Dump, Winston-Thomas Wastewater Treatment Plant, and Lemon Lane Landfill. Prepared by Tetra Tech. (dated December 13, 1999)
April 25, 2002 - Mini-Quality Assurance Project Plan for Neal's Landfill and Bennett's Dump Sites. Prepared by Tetra Tech. (dated February 20, 1998)
April 25, 2002 - Correspondence to Jessica Fliss of IDEM from Dottie Alke of Viacom containing air monitoring information for the Lemon Lane Landfill. Prepared by Viacom. (dated January 31, 2002)
April 3, 2002 - Neal's Landfill Revised Current Status Report. Prepared by Tetra Tech. (dated March 12, 2002) Housed in white 3-ring binder
April 3, 2002 - Lamon Lane Landfill Karst Aquifer Test Reports from October - November 2001. Prepared by Viacom. (dated March 13, 2002)
April 3, 2002 - Short Term Pump Test at 4i/4s Lemon Lane Landfill. Prepared by Viacom. (dated February 2002)
April 3, 2002 - Illinois Central Spring Treatment Plant - January 2002 Monthly Operations Report. Prepared by Earth Tech. (dated February 20, 2002)
April 3, 2002 - Illinois Central Spring Treatment Plant - February 2002 Monthly Operations Report. Prepared by Earth Tech. (dated March 21, 2002)
February 20, 2002 - Illinois Central Spring Treatment System - As built Drawings. Prepared by US EPA. (dated April 1999) Oversize item - stored in room 207
February 20, 2002 - Illinois Central Spring Treatment Plant - December 2001 Monthly Operations Report. Prepared by Earth Tech. (dated February 8, 2002)
February 20, 2002 - Final Report: Neal's Landfill Fish Assessment. Prepared by US EPA, US Fish and Wildlife and Lockheed Martin. (dated February 2002)
February 20, 2002 - Post-Excavation Groundwater Monitoring Results for Bennett's Dump, September 2001. Prepared by Viacom. (dated December 11, 2001)
February 20, 2002 - Post-Excavation Groundwater Monitoring Results for Bennett's Dump, October 2001. Prepared by Viacom. (dated December 11, 2001)
January 19, 2002 - Illinois Central Spring Treatment Plant - October 2001 Monthly Operations Report. Prepared by Earth Tech. (dated November 28, 2001)
January 19, 2002 - Illinois Central Spring Treatment Plant - November 2001 Monthly Operations Report. Prepared by Earth Tech. (dated December 13, 2001)